SITES

UTILITIES

null
Sandusky County companies and residents have access to an abundance of utilities at very affordable rates. From electricity to natural gas, to clean water and sewer, our utility providers have developed systems with plenty of capacity to accommodate the most demanding industries.

THE
CITY OF
BELLEVUE

Excess Capactity

Water & Sewer

Water Production/Day: 3.0 mgd max 

Plus 200,000 gals. per day additional

Avg. Water Use/Day: 1.1 mgd

Water Excess: 1.8 mgd

Waste Water Average Daily Flow: 1.1 mgd

Waste Water Max Capacity Flow: 5.0 mgd

Waste Water Design Flow: 3.0 mgd

Summer Water Usage: 1.3 mgd

Erie Co. water can be purchased up to 500,000 GPD

THE
CITY OF
CLYDE

Excess Capactity

Water & Sewer

Water Plant Capacity: 2.4 mgd

Water Used Winter Avg: 1 mgd

Winter Excess Capacity: 1.4 mgd

Water Used Summer Avg: 1.5 mgd

Summer Excess Capacity: .9 mgd

Sewer Avg Flow from WWTP is 1.9 mgd

Design Flow Max: 4.8 mgd

Avg Daily Flow since 2012: 1.8275 mgd

THE
CITY OF
FREMONT

Excess Capactity

Water & Sewer

Excess Water: 6 mgd

Capacity: 14 mgd

Avg. Daily Treated: 6.727 mgd (June)

Excess Sewer: 2 mgd

Avg. Daily Design Flow Capacity: 7.6 mgd

Peak Design Flow: 24 mgd

Avg. Daily Treated: 8.524 mgd (2018) 11.101 (Jan – Jun 2019)*

Due to excessive precipitation

THE
VILLAGE OF
GIBSONBURG

Excess Capactity

Water & Sewer

Water supplied from 7 deep limestone wells.

Storage & Pressure: Obtained through use of a 200,000 gal. above-ground tank. 

Avg. Consumption: Calculated at 310,000 gals/day

Available Pressure: 54 to 55 pounds per sq inch (Determined by tower height)

THE
VILLAGE OF
WOODVILLE

Excess Capactity

Water & Sewer

Capacity: 1 mgd

Usage Per Day: 0.15 mgd

Wells: The village water system is supplied by 7 well, 250 feet deep, average 75 gallons per minute. Chlorine disinfection – EPA mandated plus floride. 

Water Storage: 0.1 mgd overhead (water tower) & 0.2 mgd underground

Wastewater Capacity: 0.3 mgd