SITES
UTILITIES
THE
CITY OF
BELLEVUE
Excess Capactity
Water & Sewer
Water Production/Day: 3.0 mgd max
Plus 200,000 gals. per day additional
Avg. Water Use/Day: 1.1 mgd
Water Excess: 1.8 mgd
Waste Water Average Daily Flow: 1.1 mgd
Waste Water Max Capacity Flow: 5.0 mgd
Waste Water Design Flow: 3.0 mgd
Summer Water Usage: 1.3 mgd
Erie Co. water can be purchased up to 500,000 GPD
THE
CITY OF
CLYDE
Excess Capactity
Water & Sewer
Water Plant Capacity: 2.4 mgd
Water Used Winter Avg: 1 mgd
Winter Excess Capacity: 1.4 mgd
Water Used Summer Avg: 1.5 mgd
Summer Excess Capacity: .9 mgd
Sewer Avg Flow from WWTP is 1.9 mgd
Design Flow Max: 4.8 mgd
Avg Daily Flow since 2012: 1.8275 mgd
THE
CITY OF
FREMONT
Excess Capactity
Water & Sewer
Excess Water: 6 mgd
Capacity: 14 mgd
Avg. Daily Treated: 6.727 mgd (June)
Excess Sewer: 2 mgd
Avg. Daily Design Flow Capacity: 7.6 mgd
Peak Design Flow: 24 mgd
Avg. Daily Treated: 8.524 mgd (2018) 11.101 (Jan – Jun 2019)*
Due to excessive precipitation
THE
VILLAGE OF
GIBSONBURG
Excess Capactity
Water & Sewer
Water supplied from 7 deep limestone wells.
Storage & Pressure: Obtained through use of a 200,000 gal. above-ground tank.
Avg. Consumption: Calculated at 310,000 gals/day
Available Pressure: 54 to 55 pounds per sq inch (Determined by tower height)
THE
VILLAGE OF
WOODVILLE
Excess Capactity
Water & Sewer
Capacity: 1 mgd
Usage Per Day: 0.15 mgd
Wells: The village water system is supplied by 7 well, 250 feet deep, average 75 gallons per minute. Chlorine disinfection – EPA mandated plus floride.
Water Storage: 0.1 mgd overhead (water tower) & 0.2 mgd underground
Wastewater Capacity: 0.3 mgd
Wastewater Usage Per Day: 0.33 mgd